Metalika C-1200 Concrete pipe making machine
不含增值稅價格
請向賣家詢價
列印
INFO
產品類別
碎石混凝土機械
品牌/ 型號
Metalika C-1200 Concrete pipe making machine
出廠年份
2020
額外選項
全新/未使用過
機械所在位置(請填城市名,例如台北..等)
Sopot (Srbija)
國家
塞爾維亞
一般級別
1
2
3
4
5
Mascus產品ID碼
778AEBF6
詳細資料
引擎/發動機
Elektro
狀況/保固
12 meseci
生產國
塞爾維亞
交貨條件
FCA, CPT, CIP, DAT, DAP, DDP, FAS, FOB, CFR/C&F (Cost and Freight) 運費在內價, CIF, EXW
認證
EPA, CE, ANSI, AS, CSA, EAC GOST, TRUA, JIS
配件
控制系統
控制室
混凝土儲存器
其他資料
Concrete Pipe Machine C-1200 (Machine for producing concrete pipes).
Machine for producing concrete pipes C-1200 produces concrete pipes diameter from 300-1200mm by vibrating of core.
Machine is placed in concrete base built according to manufacturer’s layout.
Forming head, electric and hydraulic controls are placed above surface.
Main parts of C-1200:
- Main hydraulic cylinder stand
- Hydraulic cylinder with core bearer
- Core with vibrators
Bfkxkxxqdc
- Chassis with steel plate
Technical data of Concrete Pipe making machine C-1200:
- Pipe diameter: fi200 - fi1200
- Pipe height max: 1m
- Installed power: 18 kW / 380 V
- Simultaneously max: 11 KW
Capacity for producing concrete pipes height 1m:
1. 150 pipes - fi300 per 8h
2. 150 pipes - fi400 per 8h
3. 120 pipes - fi500 per 8h
4. 90 pipes - fi600 per 8h
5. 50 pipes - fi1000 per 8h
6. 40 pipes - fi1200 per 8h
- Concrete base dimensions: 4100x3470x2150
- Forming head height 1500 mm.
- Total weight without ring pads: 6135 kg (with outside moulds and core fi300/400/600)
Number of workers needed:
•Concrete transport from concrete plant to machine C-1200: 1
•Operator C-1200 : 1
•Fresh pipes transport from machine to curing place with accu cart: 1
or
•Fresh pipes transport from machine to curing place with standard cart for fi300-fi 700mm: 1
or
•Fresh pipes transport from machine to curing place with standard cart for fi800-fi 1200mm: 3
•Worker for placing ring pad in machine: 1
Space required for machine C-1200……………………… 70m2
Storage place for ring pads and moulds......………………..10m2
Space required for daily production of pipe fi 1000mm:
•45 pipes fi 1000: 60m2
•Pipes need to cure 48h before removing ring pad: 120m2
•Pipes need to cure for 10 days before transport (storage of products): 400m2
Total space required for production of pipes:
660m2 + 100m2 for transport paths = 760m2
*It is good to have all this space indoor, but necessary indoor space is only for machine (70m2), rest can be done on the outdoor.
Mechanisation:
Forklift 5t, with silo, for concrete transport (from concrete plant to machine C-1200)
For more extra optional equipment and detail offer, send inquiry or call me on my mobile number.