RB iconIP iconMPE iconRBAS iconRouse icon

V-Tech VERLIFT

不含增值稅價格

Favorite我的最愛
share分享
Save search儲存搜尋
列印

INFO

產品類別
塔式起重機
品牌/ 型號
V-Tech VERLIFT
出廠年份
2009
使用時數
8663 h
機械所在位置(請填城市名,例如台北..等)
Bassum, Vokietija, Vilniaus apskritis
國家
立陶宛
Mascus產品ID碼
6C1F24ED

定價

幣別選擇

詳細資料

總重
6134 kg 公斤
最大舉升能力
32000 kg 公斤
吊臂長度
1180 cm 公分
最大舉升高度
7700 cm 公分
平衡重錘
Concrete block
出廠顏色
Yellow
載架類型
輪式
附屬裝置
With the VERLIFT crane it is possible to build up in very extreme conditions (wind and temperature) safely element by element. During the design time minimisation has also been taken into account for the positioning to object. All parts of the VERLIFT can be transported in a 20’ or 40’ container, which makes the freight forwarding to hard reachable destinations easier. The Crane is also equipped with an optional self-drive-mechanism, in order to be able to move itself. As soon as the object is assembled completely, the VERLIFT is able to lower itself through the windmill. The VERLIFT is designed in a way that the transportation is possible within three (3) 40’ containers (of which one is a 1 flat rack) and the weights and dimensions of it are as follows (last photo). Counterweight: in concrete block in the ground. Calculation standard All calculations were made according to Eurocode.
其他資料
With the VERLIFT crane it is possible to build up in very extreme conditions (wind and temperature) safely element by element. During the design time minimisation has also been taken into account for the positioning to object. All parts of the VERLIFT can be transported in a 20’ or 40’ container, which makes the freight forwarding to hard reachable destinations easier. The Crane is also equipped with an optional self-drive-mechanism, in order to be able to move itself. As soon as the object is assembled completely, the VERLIFT is able to lower itself through the windmill. The VERLIFT is designed in a way that the transportation is possible within three (3) 40’ containers (of which one is a 1 flat rack) and the weights and dimensions of it are as follows (last photo). Counterweight: in concrete block in the ground. Calculation standard All calculations were made according to Eurocode. The following load factors were considered: static: factor 1,4 dynamic: factor 1,2 Wind speed limit For the maximum admissible wind speed, following values must be respected: Lifting operations: 12 m/s Telescopic manipulation of the tower: 20 m/s Stand-still, boom as high as possible (± 12 m tower free): 60 m/s Stand-still, boom just above the windmill: 114 m/s Temperature limit The temperature during which can be worked must be restricted between -40°C to +60°C, due to the limitations of the cable sheaves.顯示更多

UAB WIND TURBINE

Vėtrungių gatvė 87-56 LT-06331 Vilnius, Vilniaus Apskritis 立陶宛
獲取電子郵件通知
report ad檢舉可疑廣告